Your crew finishes on a Friday in December and comes back in January. The gate stays chained and the plant stays put. Christmas break security camera hire covers that gap: a solar tower or trailer on site for the shutdown, a control room watching it, and collection once the crew is back.
Here's what a shutdown hire includes, which unit suits, lead times, how booking works, and how to set install and pick-up dates. For the full plan, read our guide to securing your site over the Christmas shutdown.
Christmas break security camera hire is a short-term hire of a solar camera tower or trailer that covers your site from your last day until your first day back. It includes the unit, recording and alerts, connectivity, delivery, setup and collection, with 24/7 control room monitoring as an add-on. Most shutdowns fit the 2 to 4 week bracket, and because most builders need the same dates, book in November and aim to have it locked in by 11 December.
A shutdown hire is a short-term hire with a fixed window, quoted on the same lines as any camera hire. Our guide to site security camera hire costs explains each line. For the break, you get:
Siteguard doesn't publish hire rates. A two-week hire often costs more per week than a six-month one because delivery and setup are charged once, so ask for the breakdown.
Over the break the site doesn't move, so a tower on the fixed perimeter is the usual pick. Siteguard's solar camera towers come in four configurations. Match the unit to what's staying behind.
| Unit | Best for over the break |
|---|---|
| Single Cam | One gate, container or site office (4K 8MP, 95° FOV, siren and audio) |
| Twin Cam | A perimeter needing front and rear coverage (180° FOV, siren and strobe) |
| Pan & Zoom 360° Cam | Open ground and a far fence to check (360° PTZ, up to 1km zoom) |
| Trailer | Early works, temporary compounds, towing to the next job |
A CCTV surveillance trailer earns its place when the unit tows in and out, or covers another compound in the new year. Towers set down by truck or plant and take less ground, which suits a tight urban block. Our CCTV tower vs trailer comparison has the trade-offs.
Shutting down a build this December?
See the setup Siteguard recommends for construction sites, from Twin Cam towers to after-hours monitoring and timelapse.
Siteguard for constructionThe shutdown is the one hire where every customer wants the same dates. Builders, civil contractors and depots finish in the same week, so the fleet goes out at once. Siteguard doesn't publish a cut-off date, but the later you leave it, the fewer units and install slots are left.
Work back from your last day. This timeline assumes a Friday 18 December finish and is a planning guide, so confirm availability when you enquire. Our post on Christmas shutdown 2026 dates has the state-by-state detail.
| When | What to do |
|---|---|
| Now to mid-November | Walk the site, list what's staying, get a quote |
| By Friday 27 November | Settle units, monitoring and dates |
| By Friday 11 December | Booking locked in |
| 14 to 18 December | Units installed and alerts tested |
| 25, 26 and 28 December, 1 January | Public holidays in most states (Fair Work list) |
| 4 or 11 January | Walk the site, then book collection |
Siteguard runs nationally through local dealers and installers, so a regional job doesn't always wait on a truck from a capital city. That helps with lead time. It doesn't bring back units that are already out.
A camera on its own records. Over a three-week break, a break-in on 20 December can sit on the hard drive until January. Monitoring turns the recording into a response.
With 24/7 control room monitoring, an Australian-based operator verifies every alarm, issues audio warnings and the siren, and escalates to the authorities when required, on weekends and public holidays too. The alternative is self-monitoring through Siteguard Foreman: alerts go to your phone and you check the live view, which works if someone will pick up at 2am on Boxing Day. Decide before the gates close, and agree who gets called and in what order.
"Last Christmas we had 21 break-ins into our construction site. We installed a Siteguard system on site and this Christmas we only had 1 attempted break-in. It has even saved us the cost of paying for security guards." Kevin, Senior PM, Hines Constructions Pty Ltd
Who's watching your site at 2am on Boxing Day?
Siteguard's operators verify every alarm and respond in real time, nights, weekends and public holidays.
How monitoring worksBooking starts with a call or the enquiry form, which asks for your hire period (less than a week up to 6 to 12 months), installation timeframe, industry and main concern. For a shutdown, that's usually the 2 to 4 week bracket and "next week" or "within 2 to 4 weeks" if you're reading this in November.
Have these ready for a like-for-like quote:
The team recommends a setup for your industry, environment and budget, confirms availability for your dates and sends the quote. Before you sign, check the minimum hire period, what the rate includes, off-hire notice, and who carries the risk if the unit is damaged. Our Christmas shutdown security checklist covers the rest.
Set the install date in your last working week, not on your last day. A unit that goes in on the Monday gives you four days to test alerts, adjust zones around parked plant, and fix a camera pointed at a hoarding instead of the gate. Then do your last-day lock-up walk with the cameras already live.
Set the pick-up date after your first full day back. The last nights of the break carry the same risk as the first, and day one is when you find out what moved. Walk the site, review the break's events, then release the unit. If the return date slips, tell the team early so the hire window extends rather than lapses. And note when site power goes off: the solar unit doesn't care, but wired lights stop with the board, so place cameras around what stays lit.
A solar camera tower or trailer for a fixed window, with recording, alerts, connectivity, delivery, setup and collection. Control room monitoring is an add-on that puts an Australian-based operator on every alarm, public holidays included.
As early in November as you can. Most builders need cover on the same dates, so units and install slots go to the sites that booked first. Aim to have it locked in by 11 December and confirm availability when you enquire.
Install in your last working week so alerts can be tested while the crew is on site. Collect after your first full day back, once you've walked the site and reviewed the break's events.
Call 1300 479 000 or send an enquiry with your postcode, your last day, your first day back and what's staying on site. The team recommends a setup, confirms availability and sends a quote.
Book shutdown cover before the fleet goes out
Tell us your postcode, your last day and your first day back. We'll recommend the right unit and monitoring and confirm availability for your dates.
Enquire Now Or call 1300 479 000