Tracking Subcontractor Attendance on Construction Sites

Two timestamped site camera snapshots of an earthworks project, taken 30 minutes apart on 15 January 2026, showing covered stockpiles, plant and trenching
09:30:07 and 10:00:05. Two cameras, two time stamps, and nobody's memory involved.

The invoice says eight hours. The site diary says "sparkies on site". Nobody in the office can tell you whether they rolled in at 7am or 10:30, and the plasterers who lost the morning have their own version.

The subcontractor attendance tracking construction site managers can defend comes down to a timestamped record made as it happened. Here's how to build one, and how to use it on hours, delays and back-charges without starting a war with your trades.

Quick answer

The subcontractor attendance tracking construction site teams can rely on pairs the sign-in register with timestamped camera records from the gate and work area. Cameras show when people and vehicles came and went, and number plate recognition ties vehicles to a company. Check those times before you approve hours, claim a delay or raise a back-charge.

Why sign-in sheets don't settle the argument

A sign-in register tells you who says they were here. It's filled in by the person being paid, often after the fact, and the sign-out line is the first thing forgotten.

The site diary has the opposite problem. A tired supervisor writes "electrician on site" at 5pm, not "two electricians, 9:40am to 1:15pm". Six weeks later, in a delay claim, that entry has no times to offer.

Subcontractor attendance tracking construction site supervisors can run

Four steps give you a gate record worth checking.

  1. Cover the way in. Put one camera on the gate so everyone crosses the same view. A solar camera tower needs no mains, and Siteguard's Single Cam is ideal for focused monitoring of entry points.
  2. Add the work face. The gate shows arrival, not work. Give the areas under dispute a view of their own.
  3. Log the plates. Number plate recognition reads and time-stamps every vehicle entering or leaving. Link each plate to a trade and company from induction paperwork.
  4. Name a checker. One person compares the register with the gate record each week, before invoices land.

Running trades across a busy build?

See how Siteguard sets up cameras, monitoring and reporting for construction sites.

Siteguard for construction

What a timestamped camera record proves, and what it doesn't

A camera gives you a time and a picture. That's strong evidence of what happened, and it stops there. Know the limits before the other side points them out.

QuestionThe camera showsYou still need
When did they arrive and leave?The time a person or vehicle crossed the gateRegister or plate list to name the company
How many were on site?Who's in frame at that momentHeadcount for anyone out of view
Was the work happening?Activity in the work area, in imagesInspection of quality and quantity
Why did it stop?When work stopped and restartedThe cause, and any instruction given

Using the record on hours, delays and back-charges

Hours

On a lump-sum package, hours don't change the invoice, so don't chase them. On day-work dockets they do. If the docket says eight hours and the ute came in at 9:40 and left at 3:10, you've got a conversation backed by a timestamped image.

Delays

When a late trade holds up the next one, the record shows when the area was ready and when the crew arrived. It won't rescue a missed notice, though. In a 2015 WA case, a court accepted that a subcontractor had been delayed and still refused its extension of time claim, because it hadn't followed the subcontract's notice clauses.

From a Siteguard client

"Previously, every wet weather claim got picked apart by the superintendent. Now we use Siteguard Foreman to find the exact times the work stopped and started again." Geoff, Project Engineer

Back-charges

Your subcontract decides whether a back-charge is allowed, so start there. Then attach the date, the time, the image and the programme impact. Timing matters too. NSW guidance says a payment schedule must state why you're paying less than claimed and is only valid within set periods, by default 10 business days after the claim unless your contract sets a shorter deadline. Other states differ.

Show the trade the clip first. The record cuts both ways: if the sparkies were on site at 6:55 and the slab wasn't ready, it backs them, not you. Fair records get accepted. One-sided ones get disputed.

Find the exact time, then check the docket

Siteguard Foreman puts live view, playback, event reports and Ask Foreman in one dashboard across your sites.

See Siteguard Foreman

How do you find one arrival in a week of footage?

Siteguard Foreman brings every camera, alert and event across your sites into one dashboard. Playback lets you review past recordings without downloading files, and you can pull clips and event reports by date and category.

With Ask Foreman, you get a timestamped report of vehicle and people movements, with images and summaries. So "when did the sparkies turn up?" becomes a search, and you match what comes back to your plate list or register.

Saved camera capture of a loaded dump truck on a dirt haul road at 11:36:36 am, with the soil load highlighted and its cover status marked as uncovered for review
A saved capture puts a time on the vehicle: 11:36:36 am, one loaded dump truck. Someone still checks the image.

The same times feed your AI site diary and the wider push to automate construction reporting. The gate record also helps with proving what arrived on site. Siteguard's Single Cam lists 30-day storage, so download anything that might matter and file it with the job.

Telling your trades, and checking the rules

Say it at induction: what's recorded, why, and who sees it. People accept cameras they've been told about.

Surveillance rules differ between states and territories. In NSW, for example, employers must give employees 14 days' written notice, keep cameras clearly visible and put signs at each entrance. Audio is treated more strictly than video in several states. Check the rules for your state, including how they apply to subcontractors' crews. This isn't legal advice.

Key takeaways
  • Keep the register and the diary. Use camera records to test them.
  • A camera gives you the time and the picture. People supply the name and the cause.
  • Check gate times before signing day-work dockets, and follow your contract's notice steps on delays.
  • Show the trade the clip before a back-charge goes on a payment schedule.

Frequently asked questions

How do you track subcontractor attendance on a construction site?

Keep your sign-in register and add a camera on the gate, then a view of the work area. The camera records when people and vehicles arrive and leave. Number plate recognition links utes and vans to a company. Check the two records against each other every week.

Do site cameras replace a sign-in register?

No. Inductions and your sign-in register stay. A gate camera sits beside them and gives you timestamped images to test what people wrote down.

Can camera footage support a back-charge?

It can support the facts: when a trade arrived, when work stopped and what the area looked like. Whether you can back-charge at all depends on your subcontract, so follow its notice steps and get advice before withholding payment.

Can you film subcontractors on a construction site?

Rules differ between states and territories, and audio is treated more strictly than video in several of them. Visible cameras, signage at the gate and telling trades at induction are common practice. Check the rules for your state before you switch on.

Want a gate record you can check?

Tell us about your site and we'll talk through where cameras would work best.

Enquire Now Or call 1300 479 000
Available nationwide

Ready to protect your site?

Backed by Australian support and a 24/7 control room.
Enquire Now